Studio Technologies Releases Dante-Enabled Leader Clocks

Studio Technologies introduces two Dante Leader Clocks for supporting the timing needs of Dante-compliant devices: the updated Model 5401A Dante Leader Clock and the new Model 5402 Dante Leader Clocks with GNSS Synchronization.

Both products deliver precise timing signals for use in Dante audio-over-IP applications. The synchronization needs of Dante devices connected to a local area network (LAN) can be seamlessly supported using the PTPv1 (IEEE 1588-2002) protocol. For Dante’s implementation of AES67 and ST2110, both the Model 5401A and Model 5402 provide support for the PTPv2 (1588-2008) protocol.

“With Dante ubiquitous in fixed and mobile facilities of all sizes and types, a dedicated Leader Clock can enhance system performance,” says Gordon Kapes, president of Studio Technologies. “The new Model 5402 and updated Model 5401A are designed to provide optimum performance, flexibility and system integrity. Utilizing a dedicated Leader Clock can help make system deployment and maintenance a much easier task.”

Both the Model 5401A and Model 5402 can serve as the Dante Leader Clock for literally hundreds of Dante devices that can be simultaneously active on a LAN. Additional resources, including the units’ ability to generate sine-wave audio tones, adds to their range of benefits. Any required configuration can be easily performed using the webpage interface or by way of the graphics display and controls provided on the front panel. Ethernet connections are made using standard RJ45 jacks and redundant powering is supported by way of AC Mains and 12 volts DC inputs. The lightweight units mount in one-space of a standard 19-inch equipment rack.

“The Model 5401A builds on the strengths of the popular Model 5401 while offering significant improvements,” says Kapes. “Specifically, we added a third ‘GigE’ Ethernet port to allow independent redundant Dante audio and management networks. In addition, we implemented firmware updating by way of a standard USB flash drive. This is a change from the previous method that used file transfer protocol (FTP), something that contemporary network security practices often restricts.”

The Model 5402 offers all the capabilities of the Model 5401A with the additional timing precision provided by an integrated GNSS receiver. This allows the Leader Clock’s timing reference to be derived from the four major satellite constellations: GPS (US), Galileo (Europe), BeiDou (China) and GLONASS (Russia). In addition, GPS capability can be augmented with the unit’s support of the QZSS (Japan) constellation. With satellite-based timing capability, multiple Model 5402 units can be utilized at geographically diverse locations and provide a common synchronization source for all associated Dante devices. A high-performance, weather-resistant GNSS antenna is included with each Model 5402, ensuring that full “out-of-the-box” functionality can be quickly achieved. 

You might also like...

Next-Gen 5G Contribution: Part 1 - The Technology Of 5G

5G is a collection of standards that encompass a wide array of different use cases, across the entire spectrum of consumer and commercial users. Here we discuss the aspects of it that apply to live video contribution in broadcast production.

Virtual Production At America’s Premier Film And TV Production School

The School of Cinematic Arts at the University of Southern California (USC) is renowned for its wide range of courses and degrees focused on TV and movie production and all of the sub-categories that relate to both disciplines. Following real-world…

Why AI Won’t Roll Out In Broadcasting As Quickly As You’d Think

We’ve all witnessed its phenomenal growth recently. The question is: how do we manage the process of adopting and adjusting to AI in the broadcasting industry? This article is more about our approach than specific examples of AI integration;…

Designing IP Broadcast Systems: Integrating Cloud Infrastructure

Connecting on-prem broadcast infrastructures to the public cloud leads to a hybrid system which requires reliable secure high value media exchange and delivery.

Production Control Room Tools At NAB 2024

As we approach the 2024 NAB Show we discuss the increasing demands placed on production control rooms and their crew, and the technologies coming to market in this key area of live broadcast production.